A 10 x 40 ft single-car driveway 4 inches deep takes about 6.91 tons of gravel (4.94 cubic yards at 1.4 tons per yard). A cubic yard of gravel weighs about 1.4 tons.

Gravel is sold by the ton or the cubic yard. Work out the cubic yards (length × width × depth in inches ÷ 12 ÷ 27), then multiply by about 1.4 for tons. The table uses 1.4; crushed stone and pea gravel usually fall between 1.3 and 1.5.

JobSizeCubic yardsTons
Garden path3 x 30 ft, 2 in0.560.78 tons
Patio base12 x 12 ft, 4 in1.782.49 tons
Shed pad10 x 12 ft, 4 in1.482.07 tons
Single-car driveway10 x 40 ft, 4 in4.946.91 tons
Two-car driveway20 x 40 ft, 4 in9.8813.83 tons
Two-car driveway, 6 in20 x 40 ft, 6 in14.8120.74 tons

Base layers

Driveways and patios last longer on a compacted base of crushed stone (often called crusher run or road base) under the top layer. Budget each layer separately: work out its depth and add the tons together.

Order a little extra. Gravel compacts, spreads at the edges and settles over the first year.